Update 2.0.6.1

- Public control center events can now be planned up to 7 days in advance

- Company internal control center events can be planned up to 14 days in advance

- New slots for control center events are no longer released at midnight but daily at a random time that is displayed in the scheduling form

- It is no longer possible to plan several control center events at the same time on the same map

- Fixed bug that caused events to be triggered at each bus stop

Comments